Dublin Core
Title
CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO
Abstract
The power system of Kosovo is a compact and integrated structure in hierarchical aspect. It plays an important role in the process of transmission and distribution energy to the consumers. Based on this importance analysis is necessary in order to estimate the medium and long term plans of production of electric energy and development of the power generation plants. Object of study in this article is the project for connection of generators to the substation in Decani. This article describes the simulations of the power system of Kosovo (on date 21.01.2014 at 19.00h when the load in the system is 996.978 MW) in order to emphasize the importance of the connections of generators in Decani substation. Decani substation is an important node point with specifics of the power flow distribution. The analysis of the Kosovo electric power system by means of ETAP software and using as a reference the standards applied in Kosovo, the created models aim to justify if the plans for improvement of Kosovo grid are appropriate and what kind of changes in the voltage levels and short circuits values can be expected. Keywords: Connection, Hydro Power Plant, Voltage profile, Synchronous generator, Improvement, Power System, Operation
Keywords
Article
PeerReviewed
PeerReviewed
Identifier
ISSN 978-9958-834-36-3
Publisher
International Burch University
Date
2014-05-15
Extent
2532